The area where the acrylic floor will be installed will be washed with the help of high pressure washing machines. The purpose of the washing process is to remove dust, oil, dirt, etc. on the floor. is to eliminate obstacles that are not suitable for acrylic floor covering. After the washing process, the field will be left to dry. If the ground to be applied is concrete, epoxy or polyurethane primer will be applied to the field. As the next step, acrylic resurfacer coat will be applied. Application construction stages; First, the acrylic resurfacer material will be poured into a large and clean barrel. In addition to the emptied material, a certain amount of silica acrylic sand will be added. Water will be added to the mixture to dilute the material. The resulting mixture will be mixed with mixing equipment specially produced for this purpose. After the material is completely mixed, it will be applied to the field surface via a rubber squeegee. The application will be one coat in total and the average consumption will be 450 gr/m2. After the resurfacer material is completely dry, acrylic color coat will be applied.
Application construction stages; First, the acrylic resurfacer material will be poured into a large and clean barrel. In addition to the emptied material, a certain amount of silica acrylic sand will be added. Water will be added to the mixture to dilute the material. The resulting mixture will be mixed with mixing equipment specially produced for this purpose. After the material is completely mixed, it will be applied to the field surface via a rubber squeegee. The application will be three coats in total and the average consumption will be 1050 gr/m2. Before each coat to be applied, the previous coat must be waited to dry completely. During the application of color coats, two colors will be applied. Following the completion of the color coat application, the playing lines will be drawn in accordance with international norms.